Sign In | Join Free | My burrillandco.com
Home > Medium Voltage Load Bank >

3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing

Hebei Kaixiang Electrical Technology Co., Ltd
Contact Now
    Buy cheap 3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing from wholesalers
     
    Buy cheap 3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing from wholesalers
    • Buy cheap 3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing from wholesalers
    • Buy cheap 3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing from wholesalers

    3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing

    Ask Lasest Price
    Brand Name : KAIXIANG
    Model Number : AC10.5KV-1800KW
    Certification : ISO9001
    Price : negotiable
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram,
    Supply Ability : 10 SET ONE MONTH
    Delivery Time : ONE MONTH AFTER GET DEPOSIT
    • Product Details
    • Company Profile

    3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing

    In Australia 10.5KV 1800KW Medium Voltage Load Bank For Generator Testing

    Product Description

    1. our load bank an accurately test output power and load capacity with all kinds of generators.

    2. System consists of testing/control and load bank, mainly includes AC load bank, data capture system, auto load/unload control system, heat dissipation device, assist control and PC software.

    3. User can control load bank through local control panel, also through software


    Technical Parameters


    Rating Voltage/Frequency10.5kV/50Hz, 3 phase 3 wire
    Rated power1800kw
    Max load power30MW
    Load ResolutionResistive Load: 100KW*2.200KW*1.400KW*2.600KW*1
    PF(Power Factor)1
    Load Tolerance (each step)±5%
    Load Tolerance(overall)±3%
    Display Precision0.5 class
    Control Power380VAC/50Hz,
    WeightAbout 8000kgs/set
    Wire Connection

    Load power supply input——Copper bar (star coupling)

    Control power supply input——Connector-bar

    Size6058*2438*2591mm


    Technology Advantages

    1. Communication Mode:RS485/ USB or RS232 interface for communication.

    2. Load Mode: manual load or automatic load

    3. Manual Load: input power and power factor, and load according to the preset value.

    4. Automatic Load: set several load stages and duration, then complete the process according this stages automatically. 0%- 25%,- 50%,- 75%, -100%


    Application


    1. Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units

    2. generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance.

    3. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.



    Quality 3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hebei Kaixiang Electrical Technology Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)